We love creating websites for Block Paving / Groundwork / landscaping companies and have created lots previously. If you want to know more about why as a block paving / groundwork / landscaping company you need us to create a block paving website for you. Then visit the link. The info below gives some example quotations you could start to be sending to people that email your site for quotes within 1 month of having a website designed by us:
Thank you for choosing our block paving company for your new driveway quotation.
Following our visit to your home I am able to send you a quotation for works carried out at your home.
Block Paving Area 1
To excavate an area of 60m2 to a depth of 220-250mm.
To install a membrane fabric to base of area.
To supply and lay 150-160mm of compacted base compacted in two stages.
To supply and lay sharps and screed to lay blocks onto.
To supply and lay 60m2 of burnt block pavers in a basket weave pattern.
To supply and lay charcoal edge blocks in a solider course pattern.
To supply and lay kiln dried sand across the entire paved area.
The cost of the work will be £2850.
All work and labour will be guaranteed for five years. We would be able to install your new driveway within 2 weeks if that would be convenient for yourself.
For a reference of our work please contact us for email / phone numbers we recently installed 480m2 driveway, they are more than happy for our customers to contact him for a reference.
Block Paving Area 2
To remove top surface of area to be paved
To dig out the entire area to a depth of 250mm
To lay a membrane fabric down across the entire area
To supply and lay 150mm thick of type one base
To supply and lay 30 mm sharp sand
To supply and lay 24.5m2 of brindle block paving bricks
To install a block paving manhole cover to centre of the paved area
To install channel drain system on the front edge of new driveway with a soak away to the side.
Block Paving Area 2
following my visit to your home I’m writing to thank you for choosing our block paving for you new driveway of 26m2 and to install drainage which is a requirement in your area works to start within 3 weeks, as I said in my discussion with yourself the side wall would also be included if you did require it and also the option of a step. All the work and materials for the sum of £1850, we have reduced the prices as this is a residential project. We will be waiting for your design on colour and patterns
Re-turf Lawn 1
To supply and lay approximately 11m2 of turf
To prepare the ground to lay the turf onto and remove or add soil.
To remove the plastic edge strip currently being used at edge of lawn.
To remove and re-lay the stepping stone on existing lawn mower dye to new lawn level.
The cost of all materials and labour will be £350